In 2021 Paramount were appointed to undertake an extensive scope of internal office refurbishment works to the reception, toilets and vacant office suites on the 3rd and 4th floor at Longcross – a workspace for Cardiff city centre occupiers.
Creatif was approached by Paramount with a need for fixed panels that could help divide the open plan kitchen and breakout space, which features a variety of seating options. This was achieved by taking panels from our Float agile moving panel system set in position with subtle floor mounts and metal rods connected to the ceiling, which can be seen amongst the array of exposed fixings.